Pool report
Ground and groundwater conditions where the pool is going, so the shell and the excavation can be designed without surprises.
Pool shells are designed for the ground they sit in: reactive clay, sand with a high water table, rock at shallow depth and filled ground all change the design and the excavation. Most pool engineers and certifiers ask for a soil report before they will sign off.
We drill where the pool is going, log the profile and any groundwater, and report what the shell designer and the excavator need: site class, bearing conditions, groundwater level and the excavation conditions to expect, including rock.
What you get
Who it is for
How it works
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.
We come out with a rig or hand equipment, drill the boreholes, log the soil as it comes out of the ground and take samples for the laboratory where the report needs them.
An engineer at Australian Ground Sciences checks and signs the report. It goes to you as a PDF, ready for your builder, slab designer or certifier.
Questions
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.