Geotechnical report
For everything a classification does not cover: council conditions, steep sites, basements, retaining walls, complex ground. A CDC-suitable job is a fixed fee — double the site classification fee. A DA is a custom quote, because a council condition can ask for almost anything.

There are two paths here, and which one you are on decides how the job is priced. A Complying Development Certificate (CDC) job — most single dwellings and additions that meet the applicable code — is assessed against a fixed set of standards rather than by council discretion, so the investigation scope is predictable, and the fee is fixed: double the site classification fee for your zone.
A Development Application (DA) is different. Councils in Sydney regularly attach a geotechnical condition to a development consent, particularly on sloping, filled, waterfront or sandstone-and-clay sites, and the condition can ask for almost anything: more boreholes, deeper ones, specific testing, particular commentary. That variability is exactly why a DA (and a construction certificate condition raised after one) stays a custom quote from your address and the condition's wording.
Either way, we read what has actually been asked for, scope the boreholes to it and to your drawings, and write the report to address it point by point so the certifier can tick it off. Bearing capacity, founding levels, excavation conditions, groundwater and any retaining or drainage recommendations are set out with the borehole logs behind them.
What you get
Who it is for
Further reading
How it works
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.
We come out with a rig or hand equipment, drill the boreholes, log the soil as it comes out of the ground and take samples for the laboratory where the report needs them.
A geotechnical engineer checks and signs the report. It goes to you as a PDF, ready for your builder, slab designer or certifier.
Questions
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.