Site classification
The soil report for small structures on simple ground: a house, extension, granny flat or garage. Two boreholes, lab testing where needed, a signed AS 2870 classification.

Before a slab or strip footing can be designed, someone has to say how reactive the ground is. That is a site classification: boreholes on the block, the soil profile logged and classified, and a site class under AS 2870 (A, S, M, H1, H2, E or P) with the reasoning behind it.
Ours are done by a field engineer, not a sample courier. The person who drills your block logs the profile as it comes out of the ground, decides what the laboratory needs to test, and drafts the report. A geotechnical engineer checks and signs it.
For a standard residential site the fee is fixed. Sites that need more come with a scoped quote before anything is booked.
What you get
Who it is for
Further reading
How it works
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.
We come out with a rig or hand equipment, drill the boreholes, log the soil as it comes out of the ground and take samples for the laboratory where the report needs them.
A geotechnical engineer checks and signs the report. It goes to you as a PDF, ready for your builder, slab designer or certifier.
A site classification in Sydney is finished within five business days of you accepting the quote, or you don't pay for it. All we ask is that we can get onto the block.
Need it sooner? Three business days or less for $300 + GST.
The full wording is in the service terms.
Questions
Send the site address and what you are building. Standard sites get the fixed fee straight away; anything else gets a scoped quote before we book.